Feature request · Integrations · Blocks work
Stripe connector should use the Events stream to sync modified objects
1 source thread · first seen 2022-08
Summary
Records updated long after creation are missed unless users refresh a huge window each day. The user wants the connector to read events since the last sync and update changed items.
- Affects
- team syncing Stripe to a warehouse
- Workaround
- Full refresh, which takes too long
Evidence
Excerpts are copied word for word from the source; follow the link to read it in full.
“always check the events since previous sync, go through all the modified items and update them individually”